Monday, December 17, 2012

Before Photos

Sidewall (Rib) and Roof. Shotcrete was pumped through black plastic pipe from surface

Near the Sump 

Cleaned for Spraying Shotcrete

Floor Cleaned

Wheel Barrow used to haul all loose material to dump point

Coal Side Wall (Rib) prior to shotcrete and floor cleaning

Steel beam roof control

Cleaned and Ready for Shotcrete


Coal Rib Ready to Spray. Floor is orange from acid mine water

Wood bridge built for wheel barrow trail to dump point

In Process

Rib Sprayed. Supply Pipe Line for Shotcrete
More In Process

Completed




Sun Shines in From Air Shaft

More Sun From The Shaft